Recovery From Electrical Catastrophe
When an electrical switchboard faulted, it blew up a 3,000 amp, 480 volt main breaker and two distribution sections, Player and Company was called in to assess the damage and develop a plan for immediate repair. In order to get this poultry processing plant back up and running as quickly as possible, the left over… Read more »
Hartsfield Jackson International Airport – Aviation Fuel System
Player and Company was entrusted with the expansion of the jet fuel storage and distribution system for the new International Concourse at Hartsfield Jackson International Airport. On-time is an absolute must for the world’s busiest airport. Of course, quality is paramount to the finished product that will affect thousands and thousands of passengers each day…. Read more »
Compressed Natural Gas Fueling Station
Player and Company constructed a compressed natural gas fueling station for the United Parcel Service in Atlanta, Georgia. The fueling station keeps the brown trucks loaded with clean burning natural gas at all hours of the day and night. The turnkey, fast-track project was completed on-time and within budget constraints. Player and Company self-performed the… Read more »
Pretreatment Valve Skids
Player and Company was hired to construct two new natural gas pretreatment valve skids for a liquefied natural gas plant. The skids route the pipeline natural gas through a system of pressure vessels to remove water, carbon dioxide, and other hydrocarbons from the gas before it is turned into a liquid for mass storage. The… Read more »
Ethane Removal System
Player and Company was hired as the design-build contractor for the installation of a system to remove ethane from liquefied natural gas for use as a vehicle fuel. The designed system dropped the ethane content in the liquefied natural gas from 8% to less than 4% to help reduce vehicle engine malfunctions in the dedicated… Read more »
City of Atlanta CNG Stations
Player and Company constructed two compressed natural gas fueling stations for the City of Atlanta to fuel garbage and recycling trucks. Each station consists of two CNG compressors, two natural gas dryers, one three-pack high pressure storage unit, automated valve panel, and electrical gear for power and controls. Each station was constructed from the ground… Read more »
South Deshon 24” Block Valve
The local natural gas utility distribution company had a 24-inch main pipeline valve fail. Player and Company installed the 24” block valve along busy South Deshon Road in Lithonia, Georgia. Pre-job activities consisted of obtaining operator qualification (OQ) certifications for Player and Company personnel, and the creation of shop drawings for fabrication. The shop fabrication… Read more »
Langdale Fuels CNG Station
Player and Company constructed a compressed natural gas fueling station in Valdosta, Georgia, that is open for public use. The station consists of two CNG compressors, two natural gas dryers, six high pressure storage spheres, automated valve panel, two CNG vehicle dispensers, and two credit card readers that may be used by any CNG vehicle… Read more »
LNG Truck Scale Renovation and Installation
Design build contract for an operational liquefied natural gas (LNG) facility that needed replacement of the existing truck scale for optimization purposes for weight and loading of tanker trucks. Project needed to be complete during fall and winter months during peak supply time for the need for liquefied natural gas (LNG) so scheduling and coordination… Read more »
Naturally Fresh Regulator and Meter Station
Player and Company constructed a regulator and metering station in Southwest Atlanta for pressure improvements to the natural gas distribution system. Both the metering and regulator piping sections were fabricated, tested, and coated in Player and Company’s shop. The metering and pressure regulating sections were shipped to the job site for field assembly. Field assembly… Read more »